Project NTAS - Northwest Tropical Atlantic Station for air-sea flux measurement
| Data Links |
| NTAS-VIII Deployed July 28, 2008 Argos Text files: Daily transmission: Logger 12 Logger 16 Complete listing: ASIMet1 ASIMet2 Matlab files: sys1 mat sys2 mat Plots: plot 1 plot 2 Iridium System description (PDF) Text files, ASIMet Logger 12: Daily transmission Full Plots: Met Plot 1: Last Week Full Met Plot 2: Last Week Full |
NTAS-VII April 19, 2007 to July 29, 2008 Argos Text files: ASIMet1 ASIMet2 Matlab files: sys1 mat sys2 mat Plots: plot 1 plot 2 Iridium System description (PDF) Text files: ASIMet Logger 21 Subsurface Data Plots: Met: plot 1 plot 2 Subsurface Data |
NTAS-VI February 25, 2006 to April 24, 2007 Text files: ASIMet1 ASIMet2 sys1 mat sys2 mat Plots: plot 1 plot 2 |
NTAS-V March 11, 2005 to February 28, 2006 Text files: ASIMet1 ASIMet2 Plots: plot 1 plot 2 |
NTAS-IV February 21, 2004 to March 15, 2005 Text files: ASIMet1 ASIMet2 Plots: plot 1 plot 2 |
NTAS-III Feb 15, 2003 to February 19, 2004 Text files: ASIMet1 ASIMet2 Plots: plot 1 plot 2 |
Real Time Data
Hourly meteorological data for the current deployment of the NTAS buoy are recieved via Service Argos four times daily. Data is displayed as time series and available for download as ASCII files.
NTAS-VI
The sixth mooring was deployed on February 25, 2006, from the NOAA Ship Ron Brown.
NTAS-VII
The seventh NTAS buoy was launched on April 19, 2007 during a cruise on the NOAA ship Ron Brown. As part of an engineering test, a subsurface telemetry system was deployed on the NTAS Vii buoy. Links to near-real-time data and a description of the system are on the right-hand column of this page.
ASIMet plot 1
ASIMet plot 2
Last updated: March 3, 2008
