NORSE 2023 buoy

2023/11/26NORSE recovered ~14:30Z
2023/11/23WXT failure ~09:30Z
2023/11/22HC2A air temp failure
2023/11/17NORSE redeployed ~18:00Z
2023/11/17NORSE recovered ~11:00Z to service wire walkers. It will be redeployed soon
2023/11/16
WXT and HC2A air temp issue; real-time air temperatures less than -5degC are incorrectly blanked out. Internal data is unaffected
2023/11/13NORSE deployed ~16:00Z
2023/11/08NORSE buoy departs Tromso
2023/11/05Bad HC2A replaced with spare
2023/11/04NORSE powered on in Tromso, Norway
2023/08/22 15:00Z EH Power down NORSE buoy, prepare for shipment
2023/08/21 16:30Z BG Buoy powered down 30min for data dump
2023/08/21 14:00Z BG HC2A fixed. Testing spare WXT, HC2A
2023/08/18 20:00Z BG replace battery, testing spare sensors. Possible problem with HC2a
2023/08/11BG Satellite count added to real-time messages
2023/08/10EH Test Xeos Rover, SBE37 placed in saltwater bucket
2023/08/09BG RMY compass heading added to real-time messages
2023/08/09BG Battery replaced, SR30 fixed (incorrect baud rate)
2023/08/09BG SBE37,SR30,IR20 plugged in; SR30 not working
2023/08/08BG SBG IMU antenna offsets configured

SystemSNIMEIJSONASCIIMatlabUpdated
High Frequency 1 *6520 NORSE_2023.json NORSE_2023.txt NORSE_2023.mat November 28 08:18

Buoy location

Xeos Rover

NORSE_2023_Rover.txt
Xeos Rover throughput

Documents

NORSE Docs